top of page

PROJECTS

Industrial

freres-lumber.jpg
Freres Lumber
Stayton, Oregon
Freres Lumber

 

This 185,940 SF Pre-Engineered Metal Building (PEMB) was designed to house Freres Lumber’s new Mass Plywood Panel (MPP) fabrication process.  The floor was an 8” concrete slab reinforced with fiber-mesh independent of the main building structure.  The foundation system was tied together with concrete beams under the slab to resist the thrusts of the PEMB structure

Aerial.jpg
GK Machine, Inc.
New Building
Donald, Oregon
GK Machine, Inc.

 

This is a new approximate 175,000 sq. feet structure for GK Machine to enlarge their equipment manufacturing capabilities.  The construction consists of two Pre-Engineered Metal Buildings connected to create an overall “L” shaped structure.  MSC Engineers, Inc. was the Prime on this project and handled all aspects of the design.

Don-Pancho-Tortilla-Plant-Salem OR-02.jpg
Don Pancho
Tortilla Plant
Salem, Oregon
CD Redding Construction

 

This is a new approximate 100,000 sq. feet tortilla processing plant and distribution warehouse in Salem, OR. The construction consists of a Pre-Engineered Metal Building with a combination of concrete tilt panels and metal siding with an interior two-story office space. MSC Engineers, Inc. was the Prime on this project and handled all aspects of the design. 

Other Industrial Projects

 Brentwood Facility Expansion, Molalla, OR
 Calbag/Coleman Facility, Salem, OR
 Fluid Connector Products, Salem, OR
 Hanard Machine Expansion, Salem, OR
 Kettle Foods. Salem, OR
 Specialty Polymers Building & Mezzanine Expansion, Woodburn, OR